¡¡ ¡¡
¡¡

COMPONENTS

1. Oil-resistant Filler
2. Sealing insulation Tubing
3. Oil-resistant Tubing
4. Anti-tracking Tubing
5. Stress Control Tubing
6. Oil-resistant Filler
7. Conductive Protective Tubing

Cables
  • The terminations are designed for 1-and 3-core betted screen paper insulated cables.
    For Example : ZQD, ZLQ, ZQD22, NAKBA, NABA, NKBY

PRODUCT SPECIFICATION
¡¡

Ordering Description Type Name Cross Section (§±)
4140102070110 NSZ – 10 / 1x1 10KV 1-core PLIC cable indoor termination 25-50
4140102070210 NSZ – 10 / 1x2 70-120
4140102070310 NSZ – 10 / 1x3 150-240
4140102070410 NSZ – 10 / 1x4 300-400
4140102080110 WSZ – 10 / 1x1 10KV 1-core PLIC cable outdoor termination 25-50
4140102080210 WSZ – 10 / 1x2 70-120
4140102080310 WSZ – 10 / 1x3 150-240
4140102080410 WSZ– 10 / 1x4 300-400
4140102100110 NSZ – 10 / 3x1 10KV 3-core PLIC cable indoor termination 25-50
4140102100210 NSZ – 10 / 3x2 70-120
4140102100310 NSZ – 10 / 3x3 150-240
4140102100410 NSZ – 10 / 3x4 300-400
4140102110110 WSZ – 10 / 3x1 10KV 3-core PLIC cable outdoor termination 25-50
4140102110210 WSZ – 10 / 3x2 70-120
4140102110310 WSZ – 10 / 3x3 150-240
4140102110410 WSZ – 10 / 3x4 300-400
¡¡
The normal terminations for betted screen paper insulated cables 6KV and 10KV supply without lugs. The normal length of the anti-tracking tubing and oil-resistant tubing is 650mm. If the local installation requires different length of the anti-tracking tubing, and oil-resistant tubing we can supply.


Heat-shrinkable Power Cable Accessories Testing for 10KV PILC Cable
¡¡
Item
NO
property Test Requirements Results Outdoor termination Indoor termination
1 AC withstand for 1min
(dry withstand)
GB11033 No breakdown and flashover shall occur at 45kv, 1min No breakdown and flashover occurred on the combi.sample at 45kv, 1min ¡¡ OK
2 AC withstand for 1min
(wet withstand)
GB11033 No breakdown and flashover shall occur at 45kv, 1min No breakdown and flashover occurred on the combi.sample at 45kv, 1min OK OK
3 Load cycle GB11033 Heating for 5h, cooling for 3h, Conductor¡¯s temperature is 65¡É, 3Cycles Conductor¡¯s temperture is 65¡É.Results refer to the following Test As left As left
4 Impulse Voltage withstand 1.2/50us¡¾10times GB11033 10positive and 10 negative impulses at 105KV, Flashover 1time is allowed but not including total testing times No breakdown of the combi.sample at 45kv OK OK
5 DC Voltage Withstand negative 15min GB11033 No breakdown and flashover shall occur at 52kv No breakdown and flashover occurred on the combi.sample at 52kv, 15min OK OK
6 AC Voltage withstand, 4h GB11033 No breakdown and flashover shall occur at 35kv, 4h No breakdown and flashover occurred on the combi.sample at 35kv, 4min OK OK
7 Oil-seal up test DL413 Heating for 24h, cooling for 24h, Conductor¡¯s temperature is 65¡É, Oil pressure : 100MPa Heating for 24h, cooling for 24h, Conductor¡¯s temperature is 65¡É, Oil pressure : 100MPa, No leaking, No seeping OK OK

    
¡¡

Copyright(c)since 2003 Reliance Corp. All right reserved
1304, Kumkwang Benesta,1149-2, Jung-Dong, Wonmi-Gu,
Bucheon-city, Gyeonggi-do 420-020, KOREA